Similar to this if you look at the base of the posts
Right so all goes well, get all the holes dug, moulds level, concrete mixed and poured.

Even manoeuvred the sawmill in place - and was pretty pleased with myself until I drove over the chimenea - that’s fvcked, although impressively only the legs snapped off and it held the entire weight of a Defender on it.
So I drive home to London, accidentally brought the string line levels with me and they’re still in my pocket

What the absolute fuck is that
Now I’m just upset and annoyed.
